Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.
Citation:
Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.
Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.
Citation:
Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.
After the rebuilding aimed to solve the problems in the transport system of finished product for Limestone Quarry, the good results have been achieved, which effectively solved the prohlems such as frequent equipment faults, difficult repair, dropping and powder pollution of finished primary lime occurred during transportation, etc. and prolonged the repair period with the minimization of spare part consumption and the reduction of labor intensity.
Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.
Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.