YIN Xijun, CHEN Ronggui, JIANG Guoxing, CHEN Wanli. IMPROVED SKIMMING TECHNOLOGY FOR DESULPHURIZED HOT METAL AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1998, 19(2): 24-27.
Citation:
YIN Xijun, CHEN Ronggui, JIANG Guoxing, CHEN Wanli. IMPROVED SKIMMING TECHNOLOGY FOR DESULPHURIZED HOT METAL AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1998, 19(2): 24-27.
YIN Xijun, CHEN Ronggui, JIANG Guoxing, CHEN Wanli. IMPROVED SKIMMING TECHNOLOGY FOR DESULPHURIZED HOT METAL AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1998, 19(2): 24-27.
Citation:
YIN Xijun, CHEN Ronggui, JIANG Guoxing, CHEN Wanli. IMPROVED SKIMMING TECHNOLOGY FOR DESULPHURIZED HOT METAL AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1998, 19(2): 24-27.
Based on the actual state of hot metal and pretreatment processess at pangang.the measures are proposed to improve skimming method through a series of experiments,The experimental results show the use of two in one brick for skimming is feasible. The skimming efficiency and flow rate of hot metal are 97.6% and 14. 9t/min respectively so as to meet the reguirements of vanadium recovery from hot metal. The content of calcium oxide in vanadium slag decreases to 1.28%.
YIN Xijun, CHEN Ronggui, JIANG Guoxing, CHEN Wanli. IMPROVED SKIMMING TECHNOLOGY FOR DESULPHURIZED HOT METAL AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1998, 19(2): 24-27.
YIN Xijun, CHEN Ronggui, JIANG Guoxing, CHEN Wanli. IMPROVED SKIMMING TECHNOLOGY FOR DESULPHURIZED HOT METAL AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1998, 19(2): 24-27.