Sun Xiwen, Fan Yundong, Li Pingwei, Chen Mingquan, Diao Risheng. BLOW-IN AND OPERATION FOR PANGANG 2# BLAST FURNACE[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(1): 1-5.
Citation:
Sun Xiwen, Fan Yundong, Li Pingwei, Chen Mingquan, Diao Risheng. BLOW-IN AND OPERATION FOR PANGANG 2# BLAST FURNACE[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(1): 1-5.
Sun Xiwen, Fan Yundong, Li Pingwei, Chen Mingquan, Diao Risheng. BLOW-IN AND OPERATION FOR PANGANG 2# BLAST FURNACE[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(1): 1-5.
Citation:
Sun Xiwen, Fan Yundong, Li Pingwei, Chen Mingquan, Diao Risheng. BLOW-IN AND OPERATION FOR PANGANG 2# BLAST FURNACE[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(1): 1-5.
The blow in and operation for Pangang 2# blast furnace were introduced. Based on blow in experience of the past and by means of new technical measures, the utilization coefficient of 2# blast furnace comes up to 1.938 t/(m3·d) 6 days after blowing in.
Sun Xiwen, Fan Yundong, Li Pingwei, Chen Mingquan, Diao Risheng. BLOW-IN AND OPERATION FOR PANGANG 2# BLAST FURNACE[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(1): 1-5.
Sun Xiwen, Fan Yundong, Li Pingwei, Chen Mingquan, Diao Risheng. BLOW-IN AND OPERATION FOR PANGANG 2# BLAST FURNACE[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(1): 1-5.