REVIEW AND PROSPECT OF EQUIPMENTS DEVELOPMENT AT VANADIUM RECOVERY AND STEELMAKING PLANT OF PZH STEEL
-
摘要: 攀钢提钒炼钢厂于20世纪70年代建造了国内首座120t转炉,经过30年的发展,现已具备了相当的规模,但随炼钢生产的发展及工艺技术的进步,对设备的可靠性与功能提出了更高要求。为此,在分析攀钢提钒炼钢厂现有设备状况的基础上,提出了未来发展规划。Abstract: The first 120t converter was established at PZH Steel in the 1970S.Alongside development of steelmaking production and technical improvement, the more strict technical requirements on the reliability and functions of the equipments are set.Therefore,based on the analysis of the current situation of existing equipments at Vanadium Recovery and Steelmaking Plant of PZH Steel,the program of future development of equipments was put forward.
-
Key words:
- steelmaking /
- equipment /
- development /
- program
-

计量
- 文章访问数: 59
- HTML全文浏览量: 13
- PDF下载量: 2
- 被引次数: 0